Show transcribed image text
You own a landscaping firm that specializes in commercial properties. You have obtained a subcontract (#18-001), dated September 1, 2018, to perform the landscaping work on a new "ABC Bank" building currently under construction in Lincoln Nebraska. The subcontract amount is $57,000.00. No sooner do you receive the subcontract than the General Contractor sends you a request (Request No. RFP-1) for a change order that involves the following 1. Add two Japanese Lilac trees (3 %" Trunk Diameter) 2. Add six flowering Serviceberry Trees (1 ½-Trunk Diameter) The trees are to be balled and burlaped Assume no additional time will be needed to perform the extra work. Your costs are as follows: 1. 2. 3. 4. 5, 6, 7. 8. Japanese Lilac trees Flowering Serviceberry trees Equipment cost 12 Hours of Labor Labor Burden (% of Total Labor) Sales Tax (On Mat, & Equip. Only) Overhead (General & Poject) Profit 350.00 each $175.00 each $225.00 total $18.00 per hour 40% 7% 15% 10% Your assignment is to write a letter (refer to Homework #1) to the General Contractor responding to the Request for Proposal. Your letter is to contain an attached "spreadsheet" that demonstrates how the change order amount is calculated. You are to use the format outlined on the next page for your spreadsheat. The spreadsheat should be an attachment to your letter Cleaver and Sons Construction 1420 Cheater Eldon Rd. Crete, NE 68444 Attn: Mr. Biff Cleaver, President 1 of 2